theagentindex.io/guides/compliance-deadlines/ · Last reviewed 27 Oct 2026
Free guide · Calendar · 27 Oct 2026
GRC & AI compliance deadlines and surveillance calendar (2025–2028)
Fixed statutory and standard dates first, then recurring annual surveillance and quarterly GRC planning windows. Every row links to a primary source. Not a ranking. Not legal advice.
ISO/IEC 27001 & 42001
31 Oct 2025 · Fixed standard / scheme date
ISO/IEC 27001:2022 transition completed
IAF transition from ISO/IEC 27001:2013 to ISO/IEC 27001:2022 ends 31 October 2025. Certificates to the 2013 edition are not valid after this date. 2026–2027 work is annual surveillance and the three-year recertification cycle, plus optional ISO/IEC 42001 AI management-system adoption. [1] [2] [3]
31 Oct 2026 · Recurring / planning cycle
ISO/IEC 27001 / 42001 annual surveillance milestone (2026)
First full surveillance year after the 2022-edition transition. ISO/IEC 17021-1 requires surveillance in each calendar year; recertification is typically on a three-year cycle. Also a planning marker for ISO/IEC 42001 adoption. [1] [3]
31 Oct 2027 · Recurring / planning cycle
ISO/IEC 27001 / 42001 annual surveillance / recertification window (2027)
2027 surveillance or three-year recertification planning marker after the 31 October 2025 transition. [1] [3]
PCI DSS v4.0.1
31 Mar 2025 · Fixed standard / scheme date
PCI DSS v4.0.1 future-dated requirements become mandatory
All 51 future-dated PCI DSS v4.0.1 controls that were published as future-dated become effective. Entities that validate PCI DSS after this date must address the full v4.0.1 control set in the ROC or SAQ. [4] [5]
31 Mar 2026 · Recurring / planning cycle
PCI DSS annual ROC / SAQ validation cycle (2026)
Typical annual PCI DSS assessment anniversary after the 31 March 2025 future-dated cutover. Confirm your entity’s actual ROC/SAQ date with the QSA or ISA. [5]
31 Mar 2027 · Recurring / planning cycle
PCI DSS annual ROC / SAQ validation cycle (2027)
Typical 2027 annual PCI DSS assessment anniversary. Confirm your actual ROC/SAQ date with the QSA or ISA. [5]
DORA
17 Jan 2025 · Fixed statutory date
EU DORA applies (Regulation (EU) 2022/2554)
The Digital Operational Resilience Act applies to in-scope EU financial entities and their critical ICT third-party providers. Ongoing Register of Information submissions, ICT third-party risk reviews and threat-led penetration testing (TLPT) cycles continue through 2026–2027. [6] [7]
17 Jan 2026 · Recurring / planning cycle
DORA: annual Register of Information / ICT third-party review window
Recurring 2026 planning window for Register of Information updates, ICT third-party risk reviews and TLPT scoping under DORA. Confirm current ESA / national-competent-authority filing dates. [6] [7]
17 Jan 2027 · Recurring / planning cycle
DORA: annual Register of Information / ICT third-party review window (2027)
Recurring 2027 planning window for DORA Register of Information, ICT third-party reviews and TLPT cycles. [6] [7]
EU AI Act
Full sourced timeline after the Digital Omnibus: EU AI Act timeline 2026. High-risk Annex III rules apply 2 Dec 2027; Annex I product rules apply 2 Aug 2028.
2 Feb 2025 · Fixed statutory date
EU AI Act: prohibited AI practices and AI literacy (Chapters I & II)
Article 113: Chapters I and II apply from 2 February 2025 — prohibited AI practices and AI-literacy obligations. [8] [9] [10]
2 Aug 2025 · Fixed statutory date
EU AI Act: general-purpose AI (GPAI) model obligations (Chapter V)
Article 113: Chapter V (GPAI models) and related governance obligations apply from 2 August 2025, 12 months after entry into force. [8] [9] [10]
2 Aug 2026 · Fixed statutory date
EU AI Act: most rules apply + Art. 50 transparency + enforcement starts
Most AI Act rules apply from 2 August 2026, including Article 50 transparency. Enforcement starts at national and EU level for GPAI, prohibitions, transparency and AI literacy. High-risk Chapter III Sections 1–3 no longer apply on this date (Regulation (EU) 2026/1744). See /guides/eu-ai-act-timeline/. [10] [9] [11]
2 Dec 2026 · Fixed statutory date
EU AI Act: new Art. 5 prohibitions + Art. 50(2) transition
New Article 5(1)(ba)/(bb) prohibitions (AI that generates non-consensual intimate material or child sexual abuse material) apply. Providers of generative AI systems placed on the market before 2 August 2026 must comply with Article 50(2) marking (new Art. 111(4)). [10] [11]
2 Aug 2027 · Fixed statutory date
EU AI Act: legacy GPAI models and national sandboxes
Providers of GPAI models placed on the market before 2 August 2025 must comply (Art. 111(3)); at least one national AI regulatory sandbox per Member State operational (amended Art. 57(1)); Commission delegated acts under new Art. 2(13) due. [10] [11]
2 Dec 2027 · Fixed statutory date
EU AI Act: high-risk rules for Annex III systems
High-risk rules (Chapter III Sections 1–3) apply for Annex III systems (biometrics, critical infrastructure, education, employment, migration/asylum/border, etc.). [10] [9] [11]
2 Aug 2028 · Fixed statutory date
EU AI Act: high-risk rules for AI in Annex I regulated products
High-risk rules apply for AI in products under Annex I (e.g. lifts, toys, machinery). Regulation (EU) 2026/1744 moved this date from 2 August 2027. See /guides/eu-ai-act-timeline/. [10] [9] [11]
CMMC 2.0
Phase 2 is suspended (13 July 2026). Phase 3 is unconfirmed. Do not treat 10 Nov 2026 or 10 Nov 2027 as scheduled start dates.
10 Nov 2025 · Fixed statutory date
CMMC Phase 1: Level 1 and Level 2 self-assessments in DoD solicitations
32 CFR Part 170 phased rollout. Phase 1 began 10 November 2025 and introduces CMMC Level 1 and Level 2 self-assessment requirements in applicable DoD solicitations (DFARS 252.204-7021). Phase 2 (originally 10 Nov 2026) is suspended as of 13 July 2026. [12] [13] [15]
10 Nov 2026 · Fixed statutory date
CMMC Phase 2 (suspended): C3PAO Level 2 certification in DoD solicitations
On 13 July 2026 the Department of War suspended CMMC Phase II (originally 10 Nov 2026); during the suspension solicitations may only require Level 1 (Self) or Level 2 (Self); NIST SP 800-171 Rev 2 and DFARS 252.204-7012 still apply. [13] [14] [12] [15]
10 Nov 2027 · Fixed statutory date
CMMC Phase 3 (suspended, date unconfirmed): broader Level 2 / Level 3 requirements
The CMMC phased schedule is suspended and the 10 November 2027 Phase 3 date is unconfirmed. Do not treat this as scheduled. On 13 July 2026 the Department of War suspended CMMC Phase II; during the suspension solicitations may only require Level 1 (Self) or Level 2 (Self). [13] [14] [12]
India DPDP & CERT-In
13 Nov 2026 · Fixed statutory date
India DPDP Rule 4 in force (Consent Manager registration)
DPDP Rules, 2025 (G.S.R. 846(E), rule 1(3)): Rule 4 (Consent Manager registration with the Data Protection Board) comes into force one year after publication of the Gazette of 13 November 2025, i.e. 13 November 2026. This calendar does not claim that the Board has opened applications. [17] [16]
13 May 2027 · Fixed statutory date
India DPDP Act: remaining Rules duties (18 months after 13 Nov 2025)
DPDP Rules, 2025 (G.S.R. 846(E), rule 1(4)): Rules 3, 5–16, 22 and 23 come into force 18 months after publication of the Gazette of 13 November 2025, i.e. 13 May 2027 (notice, security, breach, retention and other Data Fiduciary duties). Rule 4 (Consent Manager registration) is earlier — 13 November 2026. This calendar does not claim that the Data Protection Board has opened applications. CERT-In’s 6-hour incident-reporting Direction (28 April 2022) already applies. [16] [17] [18]
NIS2 Directive
17 Oct 2024 · Fixed statutory date
NIS2 national transposition, registration and supply-chain audits
Directive (EU) 2022/2555 required Member State transposition by 17 October 2024. 2025–2027 work is national transposition and essential/important-entity registration, incident reporting, and supply-chain security audits. Several Member States missed the original date — confirm your national law. [19] [20]
Annual SOC 2 / HITRUST / FedRAMP windows
15 Jan 2026 · Recurring / planning cycle
2026 Q1 GRC / SOC 2 Type II observation-period planning
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
15 Apr 2026 · Recurring / planning cycle
2026 Q2 GRC / HITRUST / FedRAMP continuous-monitoring review
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
15 Jul 2026 · Recurring / planning cycle
2026 Q3 GRC / 3PAO and CPA scheduling window
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
15 Oct 2026 · Recurring / planning cycle
2026 Q4 GRC / Type II evidence close and renewal planning
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
15 Jan 2027 · Recurring / planning cycle
2027 Q1 GRC / SOC 2 Type II observation-period planning
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
15 Apr 2027 · Recurring / planning cycle
2027 Q2 GRC / HITRUST / FedRAMP continuous-monitoring review
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
15 Jul 2027 · Recurring / planning cycle
2027 Q3 GRC / 3PAO and CPA scheduling window
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
15 Oct 2027 · Recurring / planning cycle
2027 Q4 GRC / Type II evidence close and renewal planning
Planning reminder for SOC 2 Type II observation periods, HITRUST validated assessments, and FedRAMP continuous monitoring / 3PAO scheduling. Not a statutory deadline — align to your report period and authorizing official. [21] [22] [23]
Get 30-day email reminders before major GRC deadlines
Free. We email the weekly Agent Index Brief and a 30-day heads-up before the fixed statutory and standard dates above. Subscribing also unlocks the .ics download. The open dataset (CC BY 4.0) is free to download with no sign-up.
Check your inbox to confirm your email. We’ll remind you 30 days before the major dates after you confirm.
Sources
- ISO — ISO/IEC 27001:2022
- IAF — ISO/IEC 27001:2022 transition (ends 31 Oct 2025)
- ISO — ISO/IEC 42001 AI management system
- PCI SSC — PCI DSS v4.0.1 publication
- PCI SSC — PCI DSS v4.0.1 future-dated requirements (31 March 2025)
- EUR-Lex — Regulation (EU) 2022/2554 (DORA)
- EIOPA — Digital Operational Resilience Act (DORA)
- EUR-Lex — Regulation (EU) 2024/1689 (EU AI Act)
- European Commission — AI Act regulatory framework
- European Commission — AI Act Service Desk timeline
- EUR-Lex — Regulation (EU) 2026/1744 (Digital Omnibus on AI)
- eCFR — 32 CFR Part 170 (CMMC Program)
- DoD CIO — About CMMC
- USW(A&S) — Implementing the Suspension of CMMC Phase II (13 July 2026)
- Acquisition.gov — DFARS 252.204-7021
- MeitY — Digital Personal Data Protection Act, 2023
- MeitY — Digital Personal Data Protection Rules, 2025
- CERT-In Directions, 28 April 2022 (6-hour incident reporting)
- EUR-Lex — Directive (EU) 2022/2555 (NIS2)
- European Commission — NIS2 Directive
- AICPA — 2017 Trust Services Criteria
- HITRUST — Authorized External Assessor list
- FedRAMP — Marketplace assessors (3PAO)
Related tools: Check an Auditor · EU AI Act timeline · Which framework · Audit-prep templates · Open dataset, search API and MCP.
NIS2 note: Directive (EU) 2022/2555 required Member State transposition by 17 October 2024. 2025–2027 work is national transposition and essential/important-entity registration, incident reporting, and supply-chain security audits. Several Member States missed the original date — confirm your national law.